Works on the quay extension at Hili Company’s container terminal in Latvia, Baltic Container Terminal, are complete. The quay was extended by 57m thus bringing the total quay length to 506m. The extension allows for servicing two large vessels simultaneously and will also significantly speed up operations at the terminal. This project was partly being 50% co-financed by the European Climate, Infrastructure and Environment Agency (CINEA) military mobility project. This was being carried out in conjunction with Riga Freeport Authority under project objective of “Enhancement of the Dual Use Capacity of Riga Port by investment in Road, Railway Access and Berth Infrastructure.”